After a 400 m long embankment, the line connects with the new line.
The north campus is well connected with the yellow line of the Delhi Metro.
The siding connected with the running line with a trailing connection in the up direction.
Not one person now connected with the line has had experience of railways in Europe or America.
There it connects with the line to Nordenham.
At Herat, it would connect with the planned line from the Iranian border.
It connected with the newer line at Mount Helena.
From there a line ran to the northeast to connect with the main line just to the west of Kaulsdorf.
The lines depot lies to the south of the station, where a link track connects the mountain railway with the main line.
On the opposite bank is a railway station which used to connect with the Assam-Bengal line of that era.