Both routes join up at Brundall railway station where they continue to Norwich.
The route briefly joins SH 6 before proceeding east again.
Soon after the old and new routes join, the spur ends at a trumpet interchange with I-5 (exit 55).
This route joins the main path on the east ridge.
The two routes stay joined until Stuttgart.
At the next exit, routes 6 and 202 join the highway.
The route then continues inland into mainland Europe and joins the two cables together at:
The route continues north through a rural-looking residential area and joins with state highway 125 after one mile (1.6 km).
Being centrally located, it falls on the routes joining the metropolitan cities.
The route then joins the secured sections of the Reintal route.